Site Prep & Concrete Specs

Get these done before install day and the crew can get your building up without delays.

Questions? Call 541-419-3203

Site prep checklist

  1. Call 811 before you dig

    It's free. They mark underground water, gas and electric lines so nobody hits one. Call before you grade, pour or set anchors.

  2. Level the site, within 2 inches

    The building needs a level spot. Grading may be needed first. An unlevel site can mean delays, labor charges, or a return trip fee.

  3. Clear the area

    Move vehicles, trailers and debris. Leave 2 feet of clearance on all sides of the building.

  4. Payment is due when the crew arrives

    Payment is due before work starts. Cash, cashier's check, money order, or card (card fee applies).

  5. Tell us about site rules

    If your site has safety rules or required training, tell us when you buy so we can plan for it.

  6. Plan for install day

    A standard carport install usually takes 4 to 6 hours. Larger or enclosed buildings take longer.

Anchoring

  • Concrete pad: concrete anchors.
  • Bare ground or gravel: ground anchors.
  • Asphalt: asphalt anchors.

Concrete specs

Concrete requirements depend on your building and manufacturer. We'll send you the exact specs for your building before you pour.

  • Buildings are not sealed to the concrete. Ask your concrete contractor about sloping the edges so water runs off.
  • Existing concrete, piers or retaining walls? Send us photos first.

In Deschutes County, the county's design criteria list the frost depth for footings. See the snow, wind and frost section of our permit guide, and don't pour until you know your building size and snow load.

FAQ

How level does the site need to be?
Within 2 inches. An unlevel site can mean delays, labor charges or a return trip fee, so grade it first if needed.
Do I need concrete?
Not always. On a concrete pad the building uses concrete anchors, on bare ground or gravel it uses ground anchors, and on asphalt it uses asphalt anchors. Ask your building department what your building needs.
How big should my concrete pad be?
Concrete requirements depend on your building and manufacturer. We'll send you the exact specs for your building before you pour.
When is payment due?
When the crew arrives, before work starts. Cash, cashier's check, money order, or card (card fee applies).

Site ready? Let's get you on the schedule.